污水处理厂管网工程施工组织设计12020年4月19日\n文档仅供参考目录第一章工程总体概述·············错误!未定义书签。第一节编制说明和依据错误!未定义书签。第一章工程总体概述······················1第一节编制说明和依据1一、编制说明···························1二、编制依据···························1三、工程概况···························1四、设计要求···························2五、工程特点···························4六、环境及作业条件························5第二节施工重点、难点分析及对策6一、施工难点分析·························7二、施工对策···························8三、施工技术方面重点、难点分析和对策···············9第三节施工目标12一、质量目标···························12二、工期目标···························12三、安全目标···························12四、文明施工及环保目标标·····················12第四节施工总体设想及施工段划分13一、总体安排设想·························13二、施工段划分··························14三、总体施工程序总体·······················14第五节施工组织机构15一、施工组织机构图························16二、项目管理机构主要人员一览表··················16三、项目管理机构主要人员简历、职称、上岗证资料复印件·······17第六节作业准备计划17一、现场准备···························17二、技术准备···························17三、施工机具准备·························18四、劳动力准备··························18五、物资准备···························19六、对埋地管线摸查························19第七节施工协调配合管理21一、与建设单位协调配合措施····················21二、与监理协调配合措施······················21三、与设计方协调配合措施·····················22四、与质监站协调配合措施·····················2322020年4月19日\n文档仅供参考第八节交通维护疏导措施...............................................................................................23一、交通疏导重点及指导思想····················23二、交通保证和协调措施······················24第二章施工进度计划和各阶段进度的保证措施及违约责任·····26第一节工程进度总计划...................................................................................................26一、编制依据···························26二、编制原则···························26三、工程进度计划网络图、横道图··················27第二节各阶段进度保证措施...........................................................................................27一、做好施工准备,确保工期····················27二、具体落实措施,确保工期····················29三、优化施工部署、缩短施工工期··················29四、采取合理技术措施,确保工期··················30五、严密组织管理、保证计划实现··················31第三章劳动力和材料投入计划及其保证措施···········34一、劳动力计划表·························34二、劳动力使用计划图.....................................................................................................34三、主要材料投入计划表······················35四、投入人力及材料保证措施····················36第四章机械设备投入计划···················38第五章施工平面布置及临时工程················39第一节临时设施布置.......................................................................................................39一、施工便道、场内运输道路布置··················39二、生活、办公用房等临设的布置··················39第二节施工供水、供电总体方案...................................................................................39一、供电方案···························39二、供水方案···························40第三节文明施工围蔽、场地硬化...................................................................................40第四节施工平面布置图...................................................................................................41第六章关键施工技术、工艺及工程项目实施重点、难点分析和解决方案41第一节施工测量放线.......................................................................................................41一、概述·····························41二、施工顺序···························42三、测量准备···························42四、测量工作···························43五、测量质量保证措施·······················44第二节明挖(深)基坑的支护施工技术措施...................................................................45一、概述·····························45二、钢板桩支护施工技术措施····················47三、钢板桩施工安全措施······················49四、钢板桩施工工艺和注意事项···················49五、旋喷桩支护施工技术措施····················50六、水泥搅拌桩施工························54第三节明挖基坑土方开挖施工技术措施.......................................................................6432020年4月19日\n文档仅供参考一、开挖前准备··························64二、土方开挖···························64三、施工放坡开挖注意事项·····················66四、余泥堆放及外运························67第四节基坑监测的重点及措施67一、概述·····························67二、监测要求···························70三、基坑围护结构的稳定性监测···················70四、围护结构的土压力监测·····················71五、基坑回弹变形监测·······················72六、地表变形监测·························72七、毗邻建筑物监测························73八、监测频率···························74九、监控测量的程序························74十、监控量测的数据分析和预测···················75第五节基坑止水、导水、排水施工技术措施75一、止水、排水、导水的目的····················76二、施工技术措施·························76三、井点降水施工技术措施·····················77四、降水监测···························81第六节明挖排水管道施工技术措施82一、概述·····························82二、明挖排水管道工程总体施工工艺流程···············82三、测量、沟槽开挖、验槽·····················82四、明挖管基施工·························85五、明挖管道安装与连接施工技术措施················85六、检查井施工··························87七、检查井与管道的连接······················88八、污水管道闭水试验·······················89第七节、基坑(管沟)回填施工质量技术控制措施89第八节机械顶管施工方法和技术措施91一、概述·····························91二、工作井、接收井施工······················91三、顶管优点及施工原理和机械选型·················95四、顶管施工工艺流程图······················96五、顶管机械设备安装就位·····················98六、顶管施工方法························100七、顶管作业井预制砼盖板及检查口作业··············104第九节恢复工程施工方法及技术措施104一、水泥稳定石屑基层施工····················104二、水泥混凝土面层施工工艺···················106第七章安全生产管理措施···················109第一节安全生产目标及体系109一、管理目标··························109二、项目部安全组织体系·····················109\n42020年4月19日\n文档仅供参考三、安全组织机构························111第二节安全生产具体管理措施.....................................................................................111一、安全教育与安全宣传措施···················111二、施工现场安全管理措施····················112三、施工现场临时用电安全措施··················112四、机械安全保证措施······················113五、防火防爆措施························114六、安全检查监督措施······················114七、成立医疗服务设施······················115八、交通疏流计划与控制·····················115第三节基坑使用维护安全措施.....................................................................................116一、基坑维护重点························116二、基坑维护措施落实······················116第八章环保与文明施工措施··················118第一节环保及文明施工目标.........................................................................................118第二节文明施工及环境保护保证体系.........................................................................118一、文明施工及环境保护管理体图·················118二、制定文明施工管理制度及管理机构···············120第三节文明施工措施.....................................................................................................120一、现场平面布置要求······················120二、现场材料堆放要求······················121三、施工作业面要求·······················121四、现场绿化··························122五、防火安全措施························122六、保持施工场地容貌整洁措施··················122第四节环境保护措施.....................................................................................................123一、防止水质污染措施······················123二、防止空气污染措施······················124三、噪音及震动控制措施·····················125四、工地围蔽··························126五、路面卫生及路况维护措施···················126六、其它环保措施························127第九章建筑物、树林保护、地下管线保护措施··········127一、原有管线保护方法和措施···················127二、建筑物保护方法和措施····················130三、花木保护方法及措施·····················131四、水土保持技术组织措施····················132五、文物保护措施························133第十章主要工序技术和质量保证措施··············134第一节质量保证体系.....................................................................................................134一、ISO9002质量保证模式····················134二、质量目标及承诺·······················134三、质量管理组织机构······················134四、质量保证体系························135五、自检验收程序························13552020年4月19日\n文档仅供参考六、各工序全过程质量控制体系··················136七、原材料检验控制程序·····················138第二节质量保证措施.....................................................................................................138一、人员保证··························138二、设备保证··························139三、材料保证··························139四、技术保证··························140五、质检、试验保证·······················140六、工程质量责任制·······················141七、重点工序的质量控制·····················141第三节主要工序及节点技术和质量保证措施.............................................................142一、测量控制技术和质量保证措施·················142二、填土压实的质量通病及防治··················142三、排水管质量通病及防治····················145四、钢筋工程质量保证措施····················146五、混凝土工程质量保证措施···················147六、模板工程质量保证措施····················148第十一章新技术应用和违约责任承诺··············149第一节新技术的应用.....................................................................................................149一、”四新”技术应用······················149二、新技术推广组织管理·····················150三、新技术应用计划·······················151第二节违约责任承诺.....................................................................................................155第十二章季节性施工措施···················156一、雨期施工工作安排······················156二、雨期施工具体技术措施····················156三、夏季施工技术措施······················158第十三章成品保护措施····················159第十四章施工节约技术措施··················160一、缩短工期··························160二、确保质量··························160三、成本控制措施························160四、确保工期··························161第十五章工程施工技术档案管理制度··············162第十六章保证民工工资支付方案················163一、保证民工工资支付的承诺···················163二、保证民工工资支付措施····················164二、编制依据··············三、工程概况··············四、设计要求··············五、工程特点··············错误!未定义书签。错误!未定义书签。错误!未定义书签。错误!未定义书签。62020年4月19日\n文档仅供参考六、环境及作业条件···········第二节施工重点、难点分析及对策...............一、施工难点分析············二、施工对策··············错误!未定义书签。错误!未定义书签。错误!未定义书签。错误!未定义书签。三、施工技术方面重点、难点分析和对策··错误!未定义书签。第三节施工目标...............................一、质量目标··············二、工期目标··············三、安全目标··············四、文明施工及环保目标标········第四节施工总体设想及施工段划分...............一、总体安排设想············二、施工段划分·············三、总体施工程序总体··········第五节施工组织机构...........................一、施工组织机构图···········错误!未定义书签。错误!未定义书签。错误!未定义书签。错误!未定义书签。错误!未定义书签。错误!未定义书签。错误!未定义书签。错误!未定义书签。错误!未定义书签。错误!未定义书签。错误!未定义书签。二、项目管理机构主要人员一览表·····错误!未定义书签。三、项目管理机构主要人员简历、职称、上岗证资料复印件错误!未定义书签。第六节作业准备计划...........................错误!未定义书签。一、现场准备··············错误!未定义书签。二、技术准备··············错误!未定义书签。三、施工机具准备············错误!未定义书签。72020年4月19日